19 January 2010

TSMC announces new production facilities designated for R&D

  • TSMC announces new production facilities designated for R&D

Semiconductor foundry Taiwan Semiconductor Manufacturing Company (TSMC) has announced the completion of its Fab 12, phase 5 building located in the Hsinchu Science Park, stating that volume production should begin there in the third quarter of 2009.

Fab 12, phase 4 and 5 are TSMC's latest generation of production facilities designated for research and development as well as initial volume production. Phase 4 began volume production in the third quarter of 2009, while construction began on Phase 5 at the end of 2009. According to TSMC, phase 5 is expected to begin volume production in the third quarter of this year to satisfy urgent recent increases in customer demand.

In addition to volume production of 28nm products, Fab 12, phase 5 will also serve as the base for research and development of 22nm and more advanced process technologies. Currently, TSMC is conducting R&D for 28nm and 22nm process technologies at its Fab 12, phase 1 and 2 facilities, and will hand 28nm technology to the phase 5 facility for volume production in the fourth quarter of this year.

The company has also announced that it will begin construction on Fab 14, phase 4 located at its Tainan site with the facility planned for completion at the end of this year.

Dr Mark Liu (pictured), TSMC's senior vice president of operations, said: "TSMC has always striven to improve its trinity of strengths - technology leadership, manufacturing excellence, and customer partnership - in order to provide steadfast support for our customers and to join with them to forge a powerful competitive force in the semiconductor industry."

Fab 12, Phase 5

* Total area of site (phase 4 and phase 5): 7.83 hectares

* Type of project: Factory building (two storeys underground, four storeys above ground)

* Building area: 83,600 square meters

* Clean room area: 22,700 square meters (approximately three soccer fields)

* Number of employees: A total of 4500 employees will be working in the phase 4 and phase 5 complex. As the R&D team will be based in this building, R&D and production line engineers will reach approximately 3500 people.

*Green building: The Fab, 12 phase 5 building incorporated many green concepts in energy conservation and pollution control in its design, including a process water conservation rate of 85%, reclamation of rain water, recirculation and reuse of general exhaust heat, and development of solar power generation and led lighting applications. TSMC's goal is to reach zero emissions of greenhouse gases.

Author
Chris Shaw

Supporting Information

Websites
http://www.tsmc.com/english/default.htm

Companies
TSMC

This material is protected by Findlay Media copyright
See Terms and Conditions.
One-off usage is permitted but bulk copying is not.
For multiple copies contact the sales team.

Do you have any comments about this article?

Add your comments

Name
 
Email
 
Comments
 

Your comments/feedback may be edited prior to publishing. Not all entries will be published.
Please view our Terms and Conditions before leaving a comment.

 

Related Articles

UK’s most modern test facilty

Peter Luff MP, Minister for Defence Equipment, Support and Technology carried ...

UK invests in graphene

Full details of how an additional £50million will be spent to help keep the UK ...

Record annual revenue for NI

National Instruments has announced record Q4 GAAP revenue of $278million, an ...

Changing channels

As cmos transistors continue to get smaller and smaller, it becomes ...

Engineering Design Show 2012

The increasing imperative is for engineers to operate across a variety of ...

Reducing the penalty count

For years, designers of industrial, medical and other isolated systems had ...

Is digital power moving forward?

It is now several years since commercial products with 'added digital ...

The real solution to fake parts

The high tech supply chain is more vulnerable to counterfeit components than ...

The CHAMP-AV6: Maximising Performance with ...

This paper presents information from a benchmark prepared by Gedae Inc. which ...

ROLEC aluCASE - Modern IP67 Diecast ...

These stylish IP67 enclosures have many intelligent design features including a ...

Manufacturing Summit 2012

Making UK Manufacturing Internationally Competitive – Wednesday 7th March 2012

Digital London Summit

Taking place on13 and 14 March 2012 at the International Convention Centre, ...

ES LIVE 2012

24 May 2012, Madejski Stadium and Conference Centre, Reading, Berkshire

Touch interface innovation

A new contact microphone, when connected to a system, is able to process sound ...

Ask the Expert: Pekka Varis

How does the Keystone Network Coprocessor offload IPSec? Pekka is a visionary ...

TI ADC for medical imaging

Look inside TI's most compact ADC for medical imaging - ADS5263 16-bit ...

Archive: New Electronics 1972

The electronics news stories making the pages of New Electronics 40 years ago ...

CES 2012 - Intel highlights

Images: highlights from Intel's keynote at the 2012 International CES.

Positive signs for 2012

There's good news for the semiconductor industry as 2011 comes to a close, with ...

Martin Harris, Altium

Chris Shaw asks Martin Harris about the latest developments at Altium

Maria Marced, President, TSMC

Innovation, technology and the right people. Graham Pitcher finds out why ...

Henri Richard, Freescale

Freescale's chief sales and marketing officer tells Graham Pitcher that he's ...